Saturday, March 23, 2019

International Concrete Repair Institute (ICRI) (updating!)

20190502

ICRI 210.2-02—Guideline for the Evaluation of Unbonded Post-Tensioned Concrete Structures
ICRI 210.3-04—Guide for Using In-Situ Tensile Pull-Off Tests to Evaluate Bond of Concrete Surface Materials
ICRI 210.3R-13—Guide for Using In-Situ Tensile Pull-Off Tests to Evaluate Bond of Concrete Surface Materials
ICRI 210.4-09—Guide for Nondestructive Evaluation Methods for Condition Assessment, Repair, and Performance Monitoring of Concrete Structures

ICRI 310.1R-08—Guide for Surface Preparation for the Repair of Deteriorated Concrete Resulting from Reinforcing Steel Corrosion
ICRI 310.2-97—Selecting and Specifying Concrete Surface Preparation for Sealers, Coatings, and Polymer Overlays
ICRI 310.3-04—Guide for the Preparation of Concrete Surfaces for Repair Using Hydrodemolition Methods

ICRI 320.2R-09—Guide for Selecting and Specifying Materials for Repair of Concrete Surfaces
ICRI 320.3-04—Guideline for Inorganic Repair Material Data Sheet Protocol
ICRI 320.4-06—Guideline for the Repair of Unbonded Post-Tensioned Concrete Structures

ICRI 340.1-06—Guideline for the Selection of Grouts to Control Leakage in Concrete Structures



No comments:

Post a Comment